Following a fire from a faulty electrical device, this property suffered significant smoke and fire damage. As a result of the firefighting response there was also water damage to many areas, particularly ground floor rooms.
Following removal of all fire debris and ACM's work began on the full refurbishment of the property. Works incl.
replacing roof tiles, batten and membrane
strengthening/repairs to first floor joists
rebuilding of internal studwork on first floor
rendering of internal masonry walls
replacement ceilings throughout
plastering of all ceilings and walls
floor and wall tiling
full rewire
replacement boiler, heating and hot and cold pipework
new kitchen and bathroom suites
full redecoration
Comments